MON W1
Spec. Tickets. Branches. No flux.
↳ Foundation poured
Fourteen days, weekends included, nothing hidden. A demo every Friday. Live in production by the second one.
Agencies plan in quarters, ninety days. We crush it to two calendar weeks: spec, build, ship. Fourteen days, weekends included, a demo every Friday, live in production by the second one.
№ 02Two weeks. Vertical slice. Live.
Typical agency
Discovery
Six-week discovery. A 40-slide deck. A kickoff meeting.
Cadence
Quarterly releases. If on schedule. If nothing breaks.
Artifact
60 slides of design before a line of code.
Pricing
Time and materials. $250/hour. Scope? Negotiable.
Ownership
They own the code. You get a license.
On-call
Support ends at deployment. Post-launch is your problem.
Week 6: discovery deck approved.
TGlobal. Code lands in your repo
Discovery
Tuesday intake. Wednesday code starts. Friday demo.
Cadence
Two weeks. Vertical slice. Production Friday.
Artifact
Wireframe. Code. Shipped. All in two weeks.
Pricing
Fixed sprint cost. Fixed deadline. Fixed scope. Done.
Ownership
Own your code. Own your deployment. Own your future.
On-call
Friday deploy. Sunday on-call. Two weeks of guardrails.
LIVE
№ 03Ten days. One shipping week.
MON W1
Spec. Tickets. Branches. No flux.
↳ Foundation poured
TUE W1
Tuesday's parallel push. API. UI. No wait.
↳ Pipes connected
WED W1
Tests green. Async posted. Momentum builds.
↳ Frame raised
THU W1
Thursday hard stop. Scope locked or shifted.
↳ Walls set
FRI W1DEMO · RECORDED
Staging. Demo. Recorded. Next week: harden and ship.
↳ First light on
MON W2
Edge cases. Performance. Telemetry hooks added.
↳ Wiring hardened
TUE W2
Code review. Coverage. Quality gates locked.
↳ Inspection passed
WED W2
Docs written. Runbook updated. Bug bash.
↳ Manuals shelved
THU W2
Deploy Thursday. Feature flag controls ramp. Safe.
↳ Keys cut
FRI W2DEMO · RECORDED
Live. Reviewed. Repeat.
↳ Doors open
A ten-storey building rises as you scroll through the sprint days. Floors completed by day: 1, foundation poured. 2, pipes connected. 3, frame raised. 4, walls set. 5, first light on. 6, wiring hardened. 7, inspection passed. 8, manuals shelved. 9, keys cut. 10, doors open.
№ 04Ownership transfer, made literal
Everything lands in your repo, your cloud, your dashboards, dealt across the table before the sprint ends.
TypeScript · Postgres · Vercel
Postgres · Node · feature flags
Datadog · Sentry
№ 05Objections, answered in writing
Clause 01
The SOW is one page and the cost is fixed. New scope becomes a new sprint, never a surprise invoice. Any re-scope lands back on your desk within 48 hours.
48H RE-SCOPEClause 02
AI writes the first draft; senior engineers review, test, and sign every merge. Nothing reaches production without a green pipeline and a human name on the review.
REVIEWED · TESTED · SIGNEDClause 03
The engineers on the first call are the engineers in your repo. No handoff to a bench. Same names, both weeks.
SENIOR-ONLY TEAMClause 04
You do. Repo, infrastructure, and data sit in your accounts from day one. If we disappear on day eleven, you lose nothing.
YOUR REPO · DAY ONEClause 05
Friday deploy, Sunday on-call, two weeks of guardrails. Included, not billed. Keep us on the same fixed sprint terms, or take the runbook and go solo.
ON-CALL THROUGH RAMP№ 06Your move
Send three things. The goal, the constraint, and what “shipped” means to you. Sprint plan back in 48 hours.